Attaching Seed Drill to Tractor

PY13031
PY13031-UN-03OCT11


  • Make sure drawbar will not interfere. If necessary, move drawbar ahead or remove it.
  • Check for any other potential interference.
  • Lower the position control lever to down the lower links.
  • Slip the left side lower link over implement hitch
  • Follow the same procedure to connect the right side lower link.
  • Remove the center link from transport hook, lift center link locking clip and rotate tab to rear of center link clip.
  • Attach center link to implement top mast.
  • Adjust center link and lift link as necessary. Lock the center link by putting the locking pin and check the implement level on ground. NOTE: For attaching the center link with 3-point hitch, the order will be left-right-top or left-top-right.
  • Using position control lever, raise the implement slowly and move the stand upward and put the lock pin.
  • With help of position control lever raise and lower the implement to check interference.

RP90046,00007CB-19-20111003