Calculate Feedgate Opening

N79290
N79290-UN-07DEC07

Equation for English Measurement

N82406
N82406-UN-18NOV08

Equation for Metric Measurement

A - Feedgate Opening (in.)

B - Yield in (lb./acre)

C - Spread Width (ft.)

D - Average Speed (mph)

E - Conveyor Shaft Revolutions per Minute (CRPM)

F - Material Weight in (lb./cu. ft.)

G - Theoretical CFR (Conveyor Rate) (cu. ft. per revolution)

H - Feedgate Opening (cm)

I - Yield (kg/ha)

J - Spread Width (m)

K - Average Speed (km/h)

L - Conveyor Shaft Revolutions per Minute (CRPM)

M - Material Weight (kg/m3)

N - Theoretical CFR (Conveyor Rate) (cm3per revolution)


If feedgate opening is not supplied with fertilizer ticket, use the appropriate equation (English or metric) to calculate correct opening.

Equations can also be used to calculate conveyor speed required for a desired application rate and feed gate opening.

NOTE: To verify CRPM, mark conveyor shaft and run spreader in manual mode with current settings.

Theoretical CFR Values

CFR (metric)1

CFR (English)2

Conveyor Type

Model

2854

0.256

Belt Over Chain Conveyor

DN456 and DN485

3400

0.305

Straight Belt Conveyor

DN456 and DN485

1605

0.144

Belt Over Chain Conveyor

Second Product Bin

1 Based on 1.0 cm feed gate opening
2 Based on 1.0 in. feed gate opening

CS12167,0000539-19-20140129