Conveyor Cleanout—As Required

N103535
N103535-UN-26APR13

Right Side Shown

N98652
N98652-UN-23MAY12

Left Side Shown

N110821
N110821-UN-24MAR14

A - Wash Port

B - Connector

Ports (A) have been provided to aid conveyor belt cleanout.

  1. CAUTION: Disconnect connector (B) from spinner PWM valve prior to performing conveyor belt cleanout. Disconnecting PWM valve prevents spinners from running while conveyor is running.

    Set conveyor speed to manual operation and select a slow speed. (See Initial Setup in Operate System section of this manual.)
  2. Start conveyor by pressing conveyor belt master on/off switch. Allow conveyor to run during cleanout.
  3. Insert pressure washer nozzle into ports (A) to wash debris from between belt.
  4. Shut off conveyor belt when finished.

CS12167,0000541-19-20140321