Adjust Application Depth

Depth of material placement can vary depending on type of application. Check with fertilizer or chemical manufacturer for information regarding application depth. Set toolbar, coulter, or nozzle to required depth.

Once desired field location of application is reached, center section and wings may be lowered by pushing SCV I forward. Even after coulters are in ground, SCV II must be constantly engaged providing oil supply to and from down pressure circuit.

Failure to keep SCV II engaged to supply a constant oil flow to down pressure system will result in coulter riding out of the ground, and could result in structural failure of the toolbar and/or hydraulic cylinder components.

KB78086,0000D47-19-20131009