Procedures Required Before Drill Operation

Before operating the drill, the following procedures need to be performed. All procedures are described in this section.

□  Set Implement Width in Performance Monitor

□  Configure and Calibrate Radar (if equipped)

□  Set Machine Width

□  Set Hopper Configuration

□  Enter Seed Settings

□  Set Tramline Pattern

□  Set Track Sensor

NS43404,00000A4-19-20081016