Procedures Required Before Drill Operation
Before operating the drill, the following procedures need to
be performed. All procedures are described in this section.
□
Set Implement Width in Performance Monitor
□
Configure and Calibrate Radar (if equipped)
□
Set Machine Width
□
Set Hopper Configuration
□
Enter Seed Settings
□
Set Tramline Pattern
□
Set Track Sensor
|
|
NS43404,00000A4-19-20081016
|
|