Operational Checklist

Before operating, make sure you have:

[ ] Correctly attached hydraulic hoses to tractor, tillage or cart. Be sure fan motor case drain hose is connected to low pressure (under 689 kPa [6.89 bar] [100 psi]) return port and not crimped.

[ ] Removed obstructions from meter inlet openings inside the tank before filling.

[ ] Closed and locked tank lids to prevent air loss.

[ ] Returned and locked auger in storage position. Returned selector valve to FAN setting.

[ ] Adjusted fan speed for desired application rate. Cleaned fan screen. Adjusted damper position, if double-shooting.

[ ] Inflated tires to proper pressure.

[ ] Checked that meter drive sprockets agree with tire size (at main drive clutch) and row spacing (at one-way clutch).

[ ] Thoroughly cleaned product residue from meter segment flutes.

[ ] Customized meter cartridge assemblies by installing/removing product doors, changing out meter segments to agree with product and installing fine tuning rings to agree with secondary manifold ports.

[ ] Checked position of half-width disconnects.

[ ] Checked and, if necessary, reset monitor/controller system with latest information. Checked operation of remote tillage/implement switch.

[ ] Performed rate check and adjusted transmission output speed(s) accordingly.

[ ] Positioned slide on stationary double-shoot manifold in proper position. Ensured handle is trapped between latch pin and bracket.

AG,OUO6023,1034 -19-21JUL00-1/1