Inspect Air System Seals, Hoses and Header Rings
IMPORTANT:
Product metering will be adversely affected if tank is not sealed tightly. If the tank is not pressurized, product will not meter properly.
1.
Inspect tank lid seals (A) at each filling or daily. Replace as necessary.
A-Tank Lid Seals
|
|
|
|
AG,OUO6023,1072 -19-21JUL00-1/5
|
|
2.
Inspect outlet hoses and coupler seals (A) daily. Replace as necessary.
A-Coupler Seals
|
1810 Shown
|
|
|
AG,OUO6023,1072 -19-21JUL00-2/5
|
|
3.
Inspect tillage primary hoses (A) for wear or damage. Replace as necessary.
NOTE:
Seasonally, hoses can be rotated one quarter turn to equalize wear and extend service life.
A-Tillage Primary Hoses
|
|
|
|
AG,OUO6023,1072 -19-21JUL00-3/5
|
|
4.
Inspect manifold header rings (A) for weathering. Replace as necessary.
A-Manifold Header Rings
|
|
|
|
AG,OUO6023,1072 -19-21JUL00-4/5
|
|
5.
Inspect secondary hoses (A) from header ring to seed boot for wear or damage. Replace as necessary.
A-Secondary Hoses
|
1850 Shown
|
|
|
AG,OUO6023,1072 -19-21JUL00-5/5
|
|