5.
Raise all openers on tool fully, and open both front rank valve (A) and rear rank valve (B) for 19 cm (7.5 in.) spacing.
6.
If equipped with row markers, adjustment may be necessary to maintain proper row spacing.
7.
If meter rollers were changed for 38 cm (15 in.) spacing, ensure proper meter rollers are installed in all active runs. See Operating Machine-Product Metering section.
8.
Calibrate meters according to procedure specified in this manual. This will give correct transmission setting for desired seed rate.
|
A-Front Rank Valve
B-Rear Rank Valve
|