Predelivery

After the machine has been completely assembled, inspect it to be sure it is ready to be operated, before it is delivered to the customer. The following check list is a reminder of important points to be inspected. Check off each item as it is found to be satisfactory, or after proper adjustment has been made.

[ ] SMV emblem and reflectors are installed.

[ ] Flashing warning lights function properly.

[ ] Safety chain is attached.

[ ] Decals are intact and legible.

[ ] All shields are in place and in good condition.

[ ] Hydraulic hoses are properly routed and secured. Hydraulic connections do not leak.

[ ] Seed hoses and wiring are properly routed and connected.

[ ] Meter cartridges are customized to customer's seeding equipment.

[ ] Correct sprockets have been installed per rear tire size and seeding equipment row spacing.

[ ] Entire machine has been inspected for loose or missing nuts or bolts.

[ ] Tires are properly inflated. Wheel hardware torqued correctly.

[ ] Any parts scratched in shipment have been touched up with paint.

[ ] Fan is rotating in correct direction.

[ ] Electrical harness(es) are properly routed and retained. Electrical connections are tight.

[ ] GREENSTAR ® display monitor is correctly installed in customer's tractor and checked for proper operation.

[ ] All grease fittings have been lubricated. See Lubrication and Maintenance section.

[ ] Make sure all customer ordered attachments have been installed.

[ ] This machine has been thoroughly checked and, to the best of my knowledge, is ready for delivery to the customer.

Date Predelivered:
Signature:

 

[ ] After inspection and signing, remove and/or copy this page. Keep signed checklist in machine file at the dealership.

GREENSTAR is a trademark of Deere & Company.

AG,OUO6023,930 -19-21JUL00-1/1