Adjusting Pump to Pump Number Setting
1.
Install special tool (A) on pump pin (B) aligning teeth of tool with teeth of scale ring (C).
2.
Loosen nut (D) and rotate scale ring with special tool until pointer (E) is pointing to number on gauge (F) that was selected from the rate chart. Tighten nut (D).
3.
Store special tool (A) on pin located on pump mounting bracket. Secure tool with clip pin.
A-Special Tool
B-Pin
C-Scale Ring
D-Nut
E-Pointer
|