Operating the Squeeze Pump

The rate of liquid fertilizer application is determined by:

  • Regular or low-rate metering pump hoses (A).
  • Position of the driver and driven gears (B).
  • Fertilizer transmission sprocket combination.


A-Hoses
B-Gears

A32491

OUO1074,0000026 -19-02OCT00-1/5


To operate squeeze pump, turn handle (A) in as far as possible.

When squeeze pump is not in use, turn handle out until there is approximately 25 mm (1 in.) gap (B) between handle and groove.

A28941
A28942

OUO1074,0000026 -19-02OCT00-2/5


If planting without applying liquid fertilizer is desired, close shut-off valves (A) to metering pumps.

Disengage pump drive as follows:

1. Remove quick-lock pin.

A36387

OUO1074,0000026 -19-02OCT00-3/5


2.

Remove and reverse lower gear (A) to prevent wear on gears and metering pump.

3.

Install quick-lock pin.


A-Lower Gear

A32302

OUO1074,0000026 -19-02OCT00-4/5


If planter is going to set overnight with liquid fertilizer in the tanks, close shut-off valves (A) to metering pump(s) to eliminate possible fertilizer flow through pump due to siphoning.


A-Shut-Off Valve

A36387

OUO1074,0000026 -19-02OCT00-5/5