Operational Checklist

Before operating, make sure you have:

[ ] Correctly attached hydraulic hoses to tractor. Be sure fan motor case drain hose is connected to low pressure (under 172 kPa [1.72 bar] [25 psi]) return port and not crimped.

[ ] Removed obstructions from meter inlet openings inside the tank before filling.

[ ] Adjusted plenum pressure for desired application rate. Cleaned fan screen.

[ ] Inflated tires to proper pressure.

[ ] Thoroughly cleaned product residue from meter segment flutes.

[ ] Customized meter wheels to agree with product.

[ ] Verified that metering gates are properly set for product to be used.

[ ] Performed rate check and adjusted transmission output speed(s) accordingly.

OUO6030,00003D2 -19-30MAR04-1/1