Mechanical SCV's: Pull lever back against rubber stop. Let oil warm up for 15 minutes.
2.
Fill hoppers or CCS bulk tanks with seed.
3.
With machine lowered in plant position, drive tractor forward approximately 5 m (15 ft) to fill seed cells.
IMPORTANT:
The hydraulic hook-up procedure will determine whether the tractor flow control valve or planter flow control valve will be used to control vacuum level. See Attaching Machine section in machine operator's manual.
4.
Turn hydraulic control knob to adjust oil flow until vacuum-gauge indicator points to vacuum level listed in chart above, AT CHOSEN PLANTING SPEED.