IMPORTANT:
On 6-m version, each seed meter must be set and calibrated.
5.
Close the hopper trapdoor (E).
6.
Fill the seed hopper with seed.
7.
Remove wing nut (J) and manifold (G) from underneath the venturi cone.
8.
Place a collection bin underneath the venturi cone. This collects a seed sample during calibration.
9.
Remove the spring pin and pull off the drive shaft. Attach the calibration handle (K) to the drive shaft as shown.
10.
Turn the calibration handle 85 times counterclockwise at approximately one revolution per second. The sample of seed collected in the collection bin corresponds to 1/10 hectares.
11.
Weigh the seed sample collected.
12.
Multiply weight in collection bin by 10 and compare to weight shown in calibration chart for this seed and meter setting. If numbers are not equal, calculate the percentage to increase or decrease meter setting (see example hereafter).
13.
Repeat calibration procedure and weigh new sample until result is acceptable.
14.
Replace manifold (G) and wing nut (J).
15.
Remove calibration handle, reconnect the drive shaft, and secure it with the spring pin.
A-Housing
B-Metering Scale
C-Red Changeover Switch (N=Normal Seed; F=Fine Seed)
D-Spindle
E-Hopper Trapdoor
F-Rotary Slide Valve
G-Manifold
H-Spring Clip on Butterfly Valve (N=Normal Seed; F=Fine Seed)
J-Wing Nut
K-Calibration Handle
|