Filling Row Unit Hoppers
CAUTION: Do not operate CCS blower without tank lids installed.
Harmful chemicals can be blown into face and seed lines will plug.
Lower machine until CCS fan starts operating and begins to fill
row units. Row unit hoppers will usually be at operating level in
under 30 seconds, however large seeds and wide planters may increase
this time to 2 minutes.
|
|
OUO6074,0000B26-19-20040326
|
|