Change Seeding Equipment, Row Spacing, or Product

Inspect and update the following items, if seeding equipment, row spacing, or product is changed. (See METER SETUP AND OPERATION section for detailed procedures.)

  1. Remove or install meter covers and meter seals to match quantity and position of primary air runs.

  2. Cap off unused primary tubes.

  3. Move tank pressurization hoses to active primaries.

  4. Remove or install meter rollers to match quantity and position of primary air runs.

  5. Remove or install fine-tuning rings on meter rollers to match number of secondary header ports.

  6. Install or engage agitators above active primary air runs. Disengage agitators above inactive primary air runs.

  7. Change meter rollers to match product and application rates.

  8. Program monitor with current information.

LD45720,0000536-19-20111114