Lubrication Intervals
|
Lubrication Intervals
|
|
Item
|
Start of Season
|
50 Hours
|
End of Season
|
|
Hitch Jack
|
●
|
|
●
|
|
Tank Lid Pivot
|
●
|
|
●
|
|
Meter Lock Levers
|
●
|
|
●
|
|
Cleanout Panel Levers
|
●
|
|
●
|
|
Conveyance Tube Swing Arm
|
●
|
|
●
|
|
Agitator and Meter Shafts
|
|
●
|
|
|
Caster Wheel Pivots-TBH
|
|
●
|
|
|
Front Beam Pivots-TBH
|
|
●
|
|

A40117B-UN-21APR98
Tank Lid Pivot—All

A65086-UN-13AUG09
Two Speed Hitch Jack

A60100-UN-25SEP07
Single Speed Hitch Jack

A65087-UN-13AUG09
Two Speed Hitch Jack

A77782-UN-01MAY13

A75235-UN-08MAY12
Cleanout Panel Levers—All

A73678A-UN-01DEC11
Each meter has one agitator shaft and meter shaft lube fitting,
located on the right-hand end of the shaft.

A40119B-UN-11AUG09
Conveyance Tube Swing Arm

A66750-UN-17MAR10
Conveyance Tube Swing Arm

A73679A-UN-01DEC11
All Meters
IMPORTANT: Do not use chain lube or any other petroleum based
lubricant on chains. Petroleum base acts as a “dirt magnet”,
holding dust on chain links and limiting free movement.
Lubricate roller chains with John Deere Multipurpose Spray Lube,
TY6350 (or equivalent) at weekly (50 hour) interval. Under adverse
operating conditions, lubricate chains daily.
Effective roller chain maintenance varies, depending on environmental
conditions and condition of the chain. The goal is to maintain free
movement at every chain link joint.

A41510A-UN-11AUG09
Caster Wheel Pivots

A41511A-UN-11AUG09
Front Beam Pivots

A76335-UN-08OCT12
A - Cover Plate
Drop the cover plate (A) down on the bottom of the air manifold
system and clean out the assembly. This area can build up with dirt
and debris causing the slide assembly to bind on doubleshoot machines.
|
|
LD45720,000054D-19-20130501
|
|