Lift Links
A greater transport clearance is obtained by shortening the links. Extra working depth is obtained by lengthening the links.
To level implement from side-to-side, adjust one link. Use handle (A) to adjust the link. After adjustment is completed, secure handle (A).
To adjust left-hand lift link:
-
If the link is equipped with an adjusting handle, proceed in the same way as for the right link.
-
If the link is not equipped with an adjusting handle, remove it from draft link and screw yoke end (B) of lift link in or out.
Length of links (C) must be kept within the following limits:
-
Minimum length 705 mm (27.8 in.)
-
Maximum length 865 mm (34.1 in.)
NOTE:
The lift link dimensions quoted above are with lift links locked in draft links (no vertical float).
|
A-Adjusting handle
B-Yoke end