Load/Depth Adjustment
CAUTION:
Before connecting implements to the three-point hitch, load/depth control (A) must be moved to position "1" (depth control) to prevent unintentional raising or lowering of the rockshaft.
A-Load/depth control
B-1=Depth control
C-2-4=Mixed control
D-5=Load control
|