Load/Depth Adjustment

LX1019345-UN-07APR98
A - Load/depth control
B - 1=Depth control
C - 2-4=Mixed control
D - 5=Load control
CAUTION: Before connecting implements to the three-point hitch,
load/depth control (A) must be moved to position "1" (depth control)
to prevent unintentional raising or lowering of the hitch.
|
|
OULXE59,00108F6-19-20070215
|
|