Selecting Drawbar Position

IMPORTANT: Drawbar must be positioned, as instructed in Attaching PTO Driven Implement in this section, for PTO-driven implement.

Drawbar (A) length can be extended:

1. Loosen drawbar locking bolts.

2. Remove front drawbar pin (B).

3. Slide drawbar to desired position.

4. Install front drawbar pin.

5. Tighten drawbar locking bolts.

Drawbar Locking Bolts - Specification

Bolt -Torque 435 N·m (322 lb-ft)

RW26053
RW56126A

AG,RF30435,2104 -19-01SEP00-1/1