Break-In Check-First 100 Hours

Engine is ready for normal operation.

During the first 100 HOURS observe the following:

IMPORTANT: John Deere Break-in oil must be added if oil level is below the ADD mark on dipstick. DO NOT fill above the crosshatch pattern or the FULL mark.

  • Perform Daily or 10 Hour Service, checking engine oil and coolant levels more frequently
  • Tighten wheel and wheel weight bolts daily during the first week of operation
  • Check for leaks
  • Operate engine at heavy loads without sustained maximum load
  • Avoid idling the engine longer than 5 minutes
  • Closely observe coolant temperature during operation
  • Check air intake system hoses and clamps

RX15494,00000C4 -19-13SEP01-1/1