Break-In Check-First 100 Hours

Engine is ready for normal operation.

During the first 100 HOURS observe the following:

IMPORTANT: John Deere Break-in Oil must be added if oil level is below the ADD mark on dipstick. Do NOT fill above the crosshatch pattern or the FULL mark.

  • Tighten wheel and axle bolts after 3 hours and after 10 hours of operation, or every 2 hours under severe conditions. Continue to tighten to specified torque daily during the first week of operation. (See Wheels, Tires, and Treads Section.)
  • Perform daily or 10 hour service. (See Maintenance and Service Intervals Section.)
  • Check engine oil level and coolant level more frequently.
  • Avoid prolonged periods of engine idling or sustained maximum load operation. If engine will idle longer than 5 minutes, stop engine.
  • Watch coolant temperature closely.
  • Check engine air intake system hoses and hose clamps for tightness.
  • Check for leaks.

RW29387,0000118 -19-23OCT02-1/1