Transmission-Hydraulic System Warm-Up-TOUCHSET™ Controls

Avoid operating the tractor under load until transmission-hydraulic system has warmed up.

1. Install jumper hose (A) into SCV I coupler.

2. Shift transmission to PARK position and operate engine at 1500 rpm.

3. Push switch on SCV set-up panel for number one SCV (B). Turn time control knob (C) to (continuous) detent position "C".

4. Pull SCV I lever to extend position.

5. Push switch on SCV set-up panel for number two SCV and turn time control knob to continuous detent position.

6. Pull SCV II lever to extend position.

7. Select SCV I and turn oil flow rate knob (D) counterclockwise until engine is slightly loaded (approximately 7.0-7.2).

8. Return SCV I and II levers to neutral position after the transmission-hydraulic system has warmed up.