Hydraulic System Warm-Up
Avoid operating the tractor under load until transmission-hydraulic system has warmed up.
Install jumper hose (A) into the number one SCV coupler.
Shift transmission to PARK position and operate engine at 1500 rpm.
Push switch (B) on SCV set-up panel for number one SCV. Turn time control knob (C) to (continuous) detent position "C".
Pull SCV I lever to extend position.
Push switch on SCV set-up panel for number two SCV and turn time control knob to continuous detent position.
Pull SCV II lever to extend position.
Select SCV I and turn oil flow rate knob (D) counterclockwise until engine is slightly loaded (approximately 7.0-7.2).
Return SCV I and II levers to neutral position after the transmission-hydraulic system has warmed up.
|