|
Engine is ready for normal operation.
During the
first 100 HOURS
observe the following:
IMPORTANT:
John Deere Break-in Oil must be added if oil level is below the ADD mark on dipstick. Do NOT fill above the crosshatch pattern or the FULL mark.
-
Tighten wheel and axle bolts after 3 hours and after 10 hours of operation, or every 2 hours under severe conditions. Continue to tighten to specified torque daily during the first week of operation. (See Wheels, Tires, and Treads Section.)
|
-
Perform daily or 10 hour service. (See Maintenance and Service Intervals Section.)
-
Check engine oil level and coolant level more frequently.
-
Avoid prolonged periods of engine idling or sustained maximum load operation. If engine will idle longer than 5 minutes, stop engine.
-
Watch coolant temperature closely.
-
Check engine air intake system hoses and hose clamps for tightness.
-
Check for leaks.
|