Draining and Refilling Gear Case (Baler Without Precutter Device)

IMPORTANT: Check level of lubricant every 800 to 1000 bales and refill as necessary.

Do not overfill gear case as this will result in overheating and oil leakage.

Drain and refill gear case (A) every 4000 to 5000 bales.

Drain the oil while it is hot (i.e after operation). Pull out dipstick (B) and drain plug (C), then drain oil into a suitable receptacle.

Clean drain plug (C) before reinstalling it back in place, then add 1.3 L (0.34 US gal) of oil. Use a type specified under "Gear Oil" in this Section.

Check oil level with dipstick (B).

CC001015

CC,570RB002997 -19-15SEP98-1/1