Discharging Bale

To ensure twine is cut, glance back to see that sheaves (A) have stopped rotating.

Keep PTO engaged except in case of 590 baler equipped with the permanent upper roll drive bundle. In this case the PTO must be disengaged.

Drive forward to clear bale (not necessary if baler is equipped with bale discharging ramp) and close gate.

IMPORTANT: Close the gate immediately after the bale ejection. Do not leave the PTO engaged for longer than the discharge cycle.

IMPORTANT: On 590 baler, keep engine speed high enough for sufficient oil flow to keep the belts tensioned when closing the gate.

CC001252

CC,570RB003882 -19-15SEP98-1/1