Adjusting Soft Core Switch
Close the gate, then loosen switch mounting screws (A).
Position switch roller (B) on highest (numbered) portion of cam (C).
Adjust switch to approximately 1 mm (0.04 in.) clearance (D) between switch body and switch arm.
Tighten screws (A).
NOTE:
On baler equipped with Electronic Wrapping Control Monitor, the second cam (E) is the bale size cam.
|
A-Screw
B-Roller
C-Soft core cam
D-1 mm (0.04 in.)
E-Bale size cam
|