Predelivery Inspection

The following checks, adjustments and service jobs were performed prior to delivery of the machine:

1. [ ] All grease fittings lubricated.

2. [ ] Gear case oil level checked and topped up (if necessary).

3. [ ] Slip clutch setting checked.

4. [ ] All bolts and nuts have been tightened to the correct torque.

5. [ ] Hydraulic hoses and connections have been checked and are free of leaks.

6. [ ] Belt tracking checked.

7. [ ] Tire pressure has been checked and adjusted (if necessary).

8. [ ] Paint and decals are smooth and neat.

9. [ ] Operator's manual has been given to customer.

10. [ ] The net knife has been wiped.

11. [ ] Talc to rubber coated net roll has been applied.

12. [ ] Battery harness has been installed on baler equipped with BaleMaster monitor.

13. [ ] Test run of the machine made.

14. [ ] Gate opens and closes freely.

15. [ ] Gate roll No 8 centered correctly in its hole.

16. [ ] Net roll tensioning springs set to 20 mm (0.78 in).

17. [ ] Bale control or monitor is functioning properly.

18. [ ] Hydraulic gate latch is functioning properly (590).

19. [ ] All controls and safety rules have been explained to the customer.

20. [ ] Chains are correctly tensioned and lubricated.

21. [ ] Baler belts are in contact with lower gate roll.

22. [ ] The precutter device is functioning properly.

Signature Dealer/Service Technician: Date:

 

CC,570RB005208 -19-24SEP99-1/1