Replacing Powerline Shear Bolt

Line up holes in shear bolt hub and install a M8 x 50 grade 8.8 cap screw and lock nut (A).

IMPORTANT: To avoid overloads on shear bolt, the PTO must be engaged slowly.

Reinstall powerline shield on baler tongue.

NOTE: See your John Deere dealer to obtain the appropriate hardware.

CC7899

OUCC006,0000271 -19-27OCT00-1/1