Removing Material from a Pile
Approach and enter pile with bucket level. If the pile is high, remove the top first.
NOTE:
Bucket top is parallel to bottom. Bucket is level when top is level. Also, use bucket level indicator to level the bucket.
Move forward slowly, lifting the loader and rolling back bucket.
NOTE:
Overfilling the bucket in heavy or packed material may cause the loader to stall. If loader stalls, back up or take less material.
|