|
The following checks, adjustments and service jobs were performed prior to delivery of the machine:
[ ] 1. All grease fittings lubricated.
[ ] 2. Gear case oil level checked and topped up (if necessary).
[ ] 3. Slip clutch setting checked.
[ ] 4. Grouper canvas tension checked.
[ ] 5. All bolts and nuts have been tightened to the correct torque.
[ ] 6. All parts delivered in the bundle have been installed on the mower-conditioner.
[ ] 7. All cotter pins have been spread (mainly on rotor).
[ ] 8. Hydraulic hoses and connections have been checked and are free of leaks.
[ ] 9. The powerline has been cut to the required dimensions and is working properly.
|
[ ]10. The machine is working properly.
[ ]11. Grouper canvas tracking checked.
[ ]12. Belt tracking checked.
[ ]13. Tire pressure has been checked and adjusted (if necessary).
[ ]14. Roll spacing has been adjusted (1465 mower-conditioner only).
[ ]15. Paint and decals are smooth and neat.
[ ]16. Operator's manual has been given to customer.
[ ]17. The operator is familiar with the safety precautions to be taken when using the machine.
[ ]18. The customer has been told that he must check the torque of disk nuts and knife bolts and change oil in cutterbar after the first 10 hours of operation.
|