|
The following checks, adjustment and service jobs were performed prior to delivery of the machine:
1.
[ ] All grease fittings lubricated.
2.
[ ] Gear case oil level checked and topped up (if necessary).
3.
[ ] Tire inflation checked and adjusted.
4.
[ ] All bolts and nuts have been tightened to specified torque.
5.
[ ] Grease from net knife wiped off.
6.
[ ] Net roll tensioning springs set to 20 mm (0.78 in.) (baler with standard net tying only).
7.
[ ] Talc applied to rubber coated net roll (baler with standard net tying only).
8.
[ ] Battery harness has been installed on baler equipped with BaleTrak
®
monitor.
9.
[ ] Test run of the machine made.
|
10.
[ ] Gate opens and closes freely.
11.
[ ] The precutter device is functioning properly.
12.
[ ] Monitor functioning properly.
13.
[ ] Switches correctly adjusted.
14.
[ ] Hydraulic hoses and connections checked for leaks.
15.
[ ] Chains are correctly tensioned and lubricated.
16.
[ ] Paint and decals are smooth and neat.
17.
[ ] Operator's Manual has been given to the customer.
18.
[ ] The operator is familiar with the safety precautions to be taken with his machine.
Date:
Signature Dealer/Service Technician:
|