Replacing Powerline Shear Bolt

Line up holes in shear bolt hub and install a M8 x 50 grade 8.8 cap screw and lock nut.

IMPORTANT: To avoid overloads on shear bolt, the PTO must be engaged slowly.

Reinstall powerline shield on baler tongue.

NOTE: See your John Deere dealer to obtain the appropriate hardware.


A-Shear bolt

CC7899

OUCC006,0000EC4 -19-19JUL05-1/1