Connecting Baler Wiring Harness to Control Monitors
Line up timing marks on connector (A) and monitor then tighten locking ring.
IMPORTANT:
Be sure timing marks on connector and monitor are lined up before tightening locking ring.
Connect the power supply plug (B) to the convenience outlet (C) on the tractor.
CAUTION:
For ELC Plus monitor, disconnect power supply plug (B) after baler operation, even though monitor is switched OFF.
A-Connector
B-Power supply plug
C-Outlet
|