Checking Net Cut Switch Adjustment (Test 8)

CC1026736


A-Fixing screws


B-Stud


C-2 mm (0.08 in.)


D-Net cut switch

IMPORTANT: Prior to carry out this test, make sure that test 1 to 7 results are "OK". Proceed to the relevant tests described in this Section.

Proceed as follows:

1. Gently push on stud (B).

2. Check that net cut switch (D) is activated after a 2 mm (0.08 in.) displacement (C) of stud (B).

If not, loosen switch fixing screws (A) and readjust switch position accordingly.

Proceed to test 9.

OUCC006,0001297 -19-01OCT07-1/1