IMPORTANT:
Prior to carry out this test, make sure that test 1 to 7 results are "OK". Proceed to the relevant tests described in this Section.
Proceed as follows:
1.
Gently push on stud (B).
|
2.
Check that net cut switch (D) is activated after a 2 mm (0.08 in.) displacement (C) of stud (B).
If not, loosen switch fixing screws (A) and readjust switch position accordingly.
Proceed to test 9.
|