9.
Remove shield (A) screws.
10.
Remove hitch (D).
11.
Scribe a mark between the frame and each tongue frame.
12.
Remove lock nut (F) of left tongue frame (B).
13.
Loosen nut (E).
14.
Raise or lower tongue frame by "T" teeth, using the mark as a start point.
15.
Tighten nut (E).
16.
Repeat step 12 to 15 to adjust the right-hand tongue frame.
17.
Check that the two tongue frames are at the same level.
18.
Install hitch (D).
19.
Set hitch (D) as horizontal as possible with baler attached to the tractor.
20.
Tighten tongue frame fixing nuts (E), lock nuts (F) and hitch fixing screw (C) to specified torque:
Specification
Tongue frame fixing nut
-Torque
|
700 N·m
|
(516 lb-ft)
|
Tongue frame lock nut
-Torque
|
300 N·m
|
(221 lb-ft)
|
Hitch fixing screw
-Torque
|
620 N·m
|
(450 lb-ft)
|
NOTE:
Make sure that all rings are engaged (not standing tip to tip) when tightening screw (C) and nuts (E)-(F).
IMPORTANT:
Slowly and carefully perform a short test with baler attached to the tractor and check that there is absolutely no interference between tongue frame (B) and hookup in short turns, as otherwise major damage on hookup will occur.
|