Adjust Needle Frame and Needle Link on Twine Baler (339 Only)

CC7724-UN-23SEP98

CC7795-UN-23SEP98
A - Needle Frame
B - 47—53 mm (1.85—2.08 in.)
C - Needle Lift Link
D - Ball Joint
E - Clamp
IMPORTANT: Plungerhead adjustment, needle timing and crank stop
must be checked after making any adjustments to needle lift link.
With needles fully raised, needle frame (A) is adjusted properly
when it clears main frame on right-hand side of bale case by distance
(B).
Adjust needle frame clearance by loosening clamp (E), disconnecting
needle lift link (C) from the needle frame and turning link.
IMPORTANT: After adjusting length of needle lift link (C), hold
ball joint (D) parallel to link bar while tightening clamp (E).
|
|
OUCC002,000230E-19-20100319
|
|