Adjust Needle Frame and Needle Link on Twine Baler (349, 359
and 459)

CC7724-UN-23SEP98

CC7931-UN-23SEP98
A - Needle Frame
B - 25—32 mm (0.98—1.26 in.)
C - Needle Lift Link
D - Ball Joint
E - Clamp
IMPORTANT: Plungerhead adjustment, needle timing and crank stop
must be checked after making any adjustments to needle lift link.
With needles fully raised, needle frame (A) is adjusted properly
when it clears main frame on right-hand side of bale case by distance
(B).
Adjust needle frame clearance by loosening clamp (E), disconnecting
needle lift link (C) from the needle frame and turning link.
IMPORTANT: After adjusting length of needle lift link (C), position
clamp (E) with screw to outside. Hold ball joint (D) parallel to link
bar while tightening clamp.
|
|
OUCC002,000230F-19-20100323
|
|