The tailings elevator conveyor chain should be tightened so that the first chain link behind the sprocket can be moved 6 to 10 mm (0.2 to 0.4 in.).
To adjust tension, turn both handles (A) at elevator head.
ML70882,0000810 -19-22MAR06-1/1