1. Remove four round-head bolts (A) and top belt shield with SMV sign.
2. Wrap chain hoist around cross frame member and raise gate.
3. When finished, replace shield and SMV sign.
A-Round-Head Bolts
AG,OUO6077,1042 -19-08AUG00-1/1