1. Remove four round head bolts and top belt shield (A) with SMV sign.
2. Wrap chain hoist around cross frame member and raise gate.
3. When finished, replace shield and SMV sign.
A-Shield
AG,OUO6059,179 -19-22JUN00-1/1