Adjusting Gate Close Switch
1.
Close gate. (
Gate/tension cylinders should be fully retracted.
)
2.
If necessary, loosen screws (D) and move switch front-to-rear so roller (B) is centered on short leg of ramp (C).
3.
Push switch arm against switch body and measure clearance between roller and ramp. Clearance should meet specifications.
Specification
Roller-to-Ramp
-Clearance
|
0.05-2.00 mm
|
(0.02-0.08 in.)
|
4.
Loosen cap screw (A) and adjust switch up-and-down to obtain specified clearance.
5.
Confirm switch operation by taking test readings using monitor-controller. (See TESTING GATE CLOSE AND OVERSIZE BALE SWITCHES-MONITOR ASSISTED [CHANNELS 011 AND 012] in this section.)
|