Installing BALE WATCH™ Monitor on 7000/7010 Series Open-Station Tractor
|
|
|
A-Bracket
B-U-Bolts
C-Monitor
D-Monitor Strap (Optional)
E-Wiring Harness
F-Tie Bands
|
Monitor Bracket on Cowling
1.
Install bracket (A) over tractor hood. Fasten with two U-bolts (B), four washers, and four nuts.
2.
Install monitor (C) on bracket in convenient location. Fasten with knob and round-head bolt.
3.
Route wiring harness (E) as follows:
|
Optional Monitor Strap Illustrated
|
BALE WATCH is a trademark of Deere & Company
|
OUO6059,000004D -19-05SEP00-1/4
|
d.
-
Fasten wiring harness to railing and bracket with tie bands (F) (tie bands not provided).
|
|
|
OUO6059,000004D -19-05SEP00-2/4
|
-
Tractor WITH Optional Right-Hand Step;
a.
Route wiring harness down hood and under platform.
b.
Fasten harness to U-bolt with tie band.
c.
Fasten harness under platform with tie bands (A) (tie bands not provided).
d.
Route harness around control console. Plug BALE WATCH
™
harness power plug into tractor convenience outlet or, if equipped, to electric twine controller harness.
e.
Route baler plug to rear of tractor.
A-Tie Bands
|
|
BALE WATCH is a trademark of Deere & Company
|
OUO6059,000004D -19-05SEP00-3/4
|
Monitor Bracket on Hand Rail
1.
Install bracket (A) on railing (B). Fasten with two U-bolts (C), four washers, and four nuts.
2.
Install monitor (D) on bracket. Fasten with knob and round-head cap screw.
3.
Route wiring harness (E) around bracket and control console.
4.
Plug BALE WATCH
™
harness power plug into tractor convenience outlet.
5.
Route baler plug to rear of tractor.
A-Bracket
B-Railing
C-U-Bolts
D-Monitor
E-Wiring Harness
|
|
BALE WATCH is a trademark of Deere & Company
|
OUO6059,000004D -19-05SEP00-4/4
|
|