Break In Baler
During the first 50—100 bales paint becomes worn in bale chamber
and on all other crop engaging surfaces. Twine tensioner springs break
in as well.
Twine tensioners need tightened sometime during the
break-in period to maintain adequate tension on the tie system. Before
performing more diagnostics on knotters, check and adjust twine tension
during break-in period.
|
|
SF04007,00009F1-19-20151222
|
|