Remove belt from sheaves (A), (B) and (C).
Install new belt.
Remove quick lock pin and move lever arm down to add belt tension.
Install quick-lock pin. Adjust belt idler tension spring to the gauge.
Reinstall shield and beater belt. Adjust beater belt idler tension spring to the gauge.
A-Sheave
B-Sheave
C-Sheave
|