Loosen cap screw (A) and disconnect selected connectors (B).
Release latches (C). Slide out central electronics box to access circuit boards.
Squeeze locking tabs on circuit board and slide from mounting bracket.
Replace fuses and relays as needed.
NOTE:
Relays and fuse contacts have thick preform coating applied from the supplier. It is recommended relays and fuses be removed an installed three times to remove preform coating on contacts for proper seating to connector. Be certain pins to all connectors are properly seated prior to installation.
|