Rephasing Reel Lift Cylinders

If reel lift cylinders have become unevenly extended during operation, rephase them by fully extending and retracting the cylinders and holding control switch for 5 seconds to remove air from system.

NOTE: If condition is bad, it may be necessary to bleed the system (see next page Bleed the System).

OUO6075,000007F -19-26JAN01-1/1