Install and Reprogram GREENSTAR System from Field Documentation or Parallel Tracking to Yield Mapping
When a GREENSTAR system is programmed for field documentation or parallel tracking and is moved to another machine to be used for Yield Mapping, the system must be reprogrammed.
The following procedures show the basic connections and programming steps needed to prepare the system to operate in Yield Mapping mode. The mobile processor, display, and position receiver must be reprogrammed to operate in the Yield Mapping mode.
For up to date mapping software go to www.StellarSupport.com.
NOTE:
Yield Mapping does not require a keycard to operate however, a Keycard must be in the mobile processor in order for the system to be reprogrammed from either parallel tracking or field documentation. All Keycards have yield mapping program installed on them.
1.
Disconnect main wiring harness connector from the position receiver connector and remove position receiver from machine.
|